Log a meter reading; consumption is calculated from previous when available.
Date of this reading. If you missed a day, pick the date you’re logging.
Previous is auto-filled from the last recorded reading when available. If you skip a day, log the next reading as usual—we use the most recent recorded reading as previous, so consumption will cover the gap until today.
Set when the previous reading was taken (e.g. first reading of the year).